Underfloor heating in a timber floor
(200mm centres)
When installing underfloor heating into a timber floor at 200mm centre's pipework is usually laid as 2 runs per joists (if joist are at 400mm centre's). Notch the end of the joists about 100mm from wall this will carry UFH pipe coming into the room and the pipework turning into the next joist see Drawing below (Maximum loop length of 120m). For Timber floors a different fixing method will be required Please CONTACT US to order (price is same as packs with different fixings) or See MULTI ZONE for written quote. Clips should be every 1m-1.5m. For PDF Drawing Click Here